What: Fremont Road CLOSED in Ozark at Missouri Route 14 (Jackson Road)

When: 7 p.m. until 6 a.m. Friday-Saturday, October 16-17

Details: Contractor crews installing storm sewer pipe underneath the road as part of the Jackson Street (Route 14) Widening Project

Traffic Impacts:

  • Fremont Road CLOSED only where crews are set up working
  • Drivers will be able to get to driveways and entrances on either side of the work zone, but will not be able to travel through the work zone
  • Drivers urged to find alternate routes. No signed detours are planned.
  • Electronic message boards located near the planned road work will alert drivers to any changes in the work schedule
  • Check MoDOT’s Traveler Information Map for road closings/traffic impacts

(Weather and/or construction delays will alter the work schedule)

Project Summary:

  • Widen Route 14 to five lanes between 32nd Street west of U.S. Route 65 and the Finley River bridge (two through lanes and a center turn lane)
  • Widen the intersection of Route 14 and Route NN (City of Ozark is sharing in the cost of this part of the project.)
  • Improve sidewalks and traffic signals in various locations
  • Completion Date: Late July 202
  • Prime Contractor: Emery Sapp & Sons, Columbia
  • Estimated Total Project Cost: $9.3 million
  • Project website: Jackson Street (Route 14) Widening

END 

(For more information, call MoDOT in Springfield at 417-895-7600 or visit www.modot.org/southwest

(Follow MoDOT’s Southwest District: Facebook | Twitter | Instagram |YouTube)

(Take the Challenge! Buckle Up/Phone Down)



Source link

Author: Editor
Editor represents multiple online news sites, including STL.News, RSSNews.Press and more. As a media company offering website hosting, design and SEO we create the news sites in part to illustrate our "search engine friendly" web hosting and design services. In addition, we believe that our "direct source news" concept helps provide accurate information to the public without bias.