SIKESTON—The Missouri Department of Transportation plans to replace three bridges on Route 162 between Gideon and Portageville, Missouri. The bridges are located over Drainage Ditches 1, 251 and 62.

The projects will be let in November 2021, with construction beginning as early as February 2022. One bridge will be constructed at a time, and contractors will complete the replacement in one location before proceeding to the next.

As work is underway, the roadway will be closed in the vicinity of each bridge. A signed detour will be in place.

Completion is anticipated by December 2022.

Interested persons may review the project in more detail and share their thoughts at www.modot.org/newmadridbridges. For more information, please contact MoDOT Project Manager Tim Pickett at (573) 472-9003, MoDOT Area Engineer David Wyman at (573) 380-2913 or MoDOT’s Customer Service Center toll-free at 1-888-ASK-MODOT (1-888-275-6636).

###

Source link

Author: Editor
Editor represents multiple online news sites, including STL.News, RSSNews.Press and more. We believe that our "direct source news" concept helps provide accurate information to the public without bias. We want to help improve technology so the news is presented as it was intended to be.