Breaking News

Federal Reserve Board – Federal Reserve Board issues enforcement action with Easthampton Savings Bank US Department of Labor announces $140M in available funding to states to create jobs, provide employment training, services in critical industries Traffic Advisory for Open Streets Boston in Jamaica Plain for July 10, 2022 Federal Court Orders Texas Unregistered Commodity Pool Operator to Pay More Than $13 Million for Commodity Fraud News Release – SUMMER SCAM SERIES: Attorney General Moody Kicks Off Summer Scam Series with Warning About Vacation Rental Scams Governor Abbott Announces Additional $30 Million In Grants To Boost Local Border Security Efforts | Office of the Texas Governor Issuance of Venezuela-Related General License 40A USDA Highlights Importance of Innovation at G20 Meeting of Agricultural Chief Scientists

Planned Roadwork for Northwest Missouri, May 30-June 5
Visitor (not verified)
Fri, 05/27/2022 – 16:30

 
Route P – Pavement repair, May 31 – June 3
Route UU – CLOSED for a roadway sealing project, June 1, 7 a.m. to 4 p.m.
DeKalb County
U.S. Route 36 – Resurfacing project westbound from east of Taylor Road to east of Route AC (Buchanan County) through mid-July. Some lane closures may remain in place around-the-clock. (Contractor: Magruder Paving, LLC)
I-35 – Resurfacing project from U.S. Route 69 (Exit 68, Daviess County) to just north of Exit 52 in Cameron (Clinton County), through mid-August. The road will be narrowed to one lane around the repair sites and paving operations, including some single-lane, around-the-clock closures. A 12-foot width restriction is in place. (Contractor: Herzog Contracting Corp.)
Gentry County
Route B – CLOSED for a bridge replacement project from 257th Street to 245th Street at the Grantham Creek Bridge, through July. More info: modot.org/gentry-county-route-b-grantham-creek-bridge-project (Contractor: Widel, Inc.)
Harrison County
Route A – CLOSED for a bridge rehabilitation project over I-35 through September. More info: modot.org/multi-county-bridge-deck-replacement-project (Contractor: Emery Sapp & Sons, Inc)
I-35 – Bridge rehabilitation project at the Pole Cat Creek Bridge at mile marker 90, south of Bethany, through October. A 12-foot width restriction is in place. More info: https://modot.org/harrison-county-interstate-35-pole-cat-creek-bridge-project  (Contractor: Widel, Inc.)*
Holt County
U.S. Route 59 – CLOSED under I-29 for a bridge deck replacement project through August. Access at the I-29/U.S. Route 59 interchange at Exit 92 near Craig will be impacted. More info: modot.org/holt-county-i-29-bridge-deck-replacement-over-us-route-59. (Contractor: Emery Sapp & Sons, Inc.)
U.S. Route 159 – Bridge rehabilitation project at the Big Lake Overflow Bridge, west of Route 111, through July. Traffic will be narrowed to one lane at the bridge, with temporary traffic signals and a 13-foot width restriction in place. More info: modto.org/holt-county-us-route-159-big-lake-overflow-bridge-rehabilitation. (Contractor: Emery Sapp & Sons, Inc.)
U.S. Route 159 – Pavement improvement and flood remediation project from the Missouri River to Route 111, north of Forest City, through December. From may 31 through June traffic at the intersection of U.S. Route 159 and Route 111 near Big Lake will be redirectd to a one-lane bypass with temporary traffic signals. (Contractor: Phillips Hardy, Inc.)
Route 111 – CLOSED for a pavement improvement and flood remediation project from U.S. Route 159 to just north of the railroad crossing at the southern end of Big Lake, through June. (Contractor: Phillips Hardy Inc.)
Route B – Drainage work from Route 120 to Road 245, June 1
Route 111 – Culvert replacement at Amber Drive, June 2
Linn County
U.S. Route 36 – Pavement repair from east of Brookfield to the Macon County line, May 31 – June 2.
Livingston County
Route C – CLOSED until further notice at the Shoal Creek Bridge due to deterioration. A bridge replacement project is currently scheduled to be part of MoDOT’s November 2022 letting.
Route A – CLOSED for a culvert replacement from 515th Street to 511th Street, May 31 – June 1, 7 a.m. to 3:30 p.m. daily
Route N – CLOSED for pavement repair, June 1 – 3, 7 a.m. to 4 p.m. daily
Route U – CLOSED for a culvert replacement from Route A to County Road 505, June 2, 7 a.m. to 3:30 p.m.
Nodaway County
U.S. Route 136 – CLOSED at the Long Branch Bridge, east of Ravenwood through August. A signed detour is in place. More info: https://modot.org/nodaway-county-us-route-136-bridge-projects (Contractor: Phillips Hardy, Inc.)*
Route AD – CLOSED for pothole patching from Route B to Galaxy Road, June 1 – 3, 6 a.m. to 4 p.m. daily
Sullivan County
Route TT – Pothole patching, May 31 – June 1
Route Z – CLOSED for pothole patching June 2 – 3, 6 a.m. to 2 p.m. daily
Worth County
Route PP & YY – Drainage work, May 31 – June 1  

* Indicates this bridge is included in Gov. Mike Parson’s $351 million Focus on Bridges program, which will repair or replace 250 bridges across the state.
###

Districts Involved

Northwest

Published On
Fri, 05/27/2022 – 12:29

Source link